top of page

Outsourced PRRC for Non-EU Manufacturers

Outsourced PRRC for non-EU manufacturers under MDR and IVDR Article 15(2), tasks per Article 15(3).

Article 15(2) PRRC for non-EU manufacturers

Under Article 15(2) of the MDR and of the IVDR, manufacturers that qualify do not have to employ their person responsible for regulatory compliance (PRRC) and may have that person permanently and continuously at their disposal instead. We provide that person as an ongoing service to manufacturers established outside the EU, with a written task description built on the duties listed in Article 15(3). To start, send us evidence of your micro or small enterprise status, your device list and your quality management system documents. Request a proposal

Who this is for

  • Manufacturers established outside the EU that qualify as micro or small enterprises under Commission Recommendation 2003/361/EC.

  • Manufacturers in Türkiye selling into the EU, where the PRRC can sit close to the manufacturing site.

  • Manufacturers placing their first device on the market without an in-house employee who meets the Article 15(1) qualifications.

  • Manufacturers whose PRRC has left and who need a permanent replacement rather than a one-off project.

Who this is not for

Manufacturers established in the EU. Medex is located in Türkiye, outside the Union, and the Commission guidance quoted below expects the PRRC of an EU manufacturer to be located in the Union. We also do not act as PRRC for medium-sized or large manufacturers: under Article 15(1) they keep the PRRC within their own organisation.

Regulatory basis

The exemption for micro and small enterprises and the condition attached to it are in the same paragraph:

"Micro and small enterprises within the meaning of Commission Recommendation 2003/361/EC shall not be required to have the person responsible for regulatory compliance within their organisation but shall have such person permanently and continuously at their disposal." (MDR Article 15(2); IVDR Article 15(2) uses the same wording)

What the PRRC is responsible for, at a minimum:

"The person responsible for regulatory compliance shall at least be responsible for ensuring that: (a) the conformity of the devices is appropriately checked, in accordance with the quality management system under which the devices are manufactured, before a device is released; (b) the technical documentation and the EU declaration of conformity are drawn up and kept up-to-date; (c) the post-market surveillance obligations are complied with in accordance with Article 10(10); (d) the reporting obligations referred to in Articles 87 to 91 are fulfilled; (e) in the case of investigational devices, the statement referred to in Section 4.1 of Chapter II of Annex XV is issued." (MDR Article 15(3))

Where the PRRC should be located, according to the Medical Device Coordination Group:

"For this reason, for manufacturers located outside the Union, it must be assumed that the PRRC should also be located outside the Union" (MDCG 2019-7 Rev.1)

And on subcontracting by micro and small enterprises:

"The micro or small enterprise may subcontract the responsibilities of a person responsible for regulatory compliance to a third party, so long as the qualification criteria are met and the manufacturer can demonstrate and document how they can meet their legal obligations." (MDCG 2019-7 Rev.1)

The same guidance recommends that the PRRC of a non-EU manufacturer be in physical and geographical proximity to the manufacturing activities. That is why this service fits manufacturers in Türkiye best; for manufacturers elsewhere outside the EU we look at proximity before we take the role on. For a plain explanation of the role, see our article on the person responsible for regulatory compliance.

What we do as your PRRC

We write each point of Article 15(3) into the task description and state how it is ensured:

  • Release check: before a device is released, we check the release records your quality management system defines. A device with incomplete records is not released with our sign-off.

  • Technical documentation and EU declaration of conformity: we check that the technical documentation follows Annexes II and III, that the declaration carries the Annex IV content, and that both are updated whenever the device, the label or the standards applied change.

  • Post-market surveillance: we check that the PMS plan is applied under Article 10(10) and Article 83, and that the PMS report or PSUR is updated as your device class requires.

  • Vigilance reporting: we set up the internal procedure for serious incidents and field safety corrective actions under Articles 87 to 91 and prepare the report with you when an incident occurs.

  • Investigational devices: where relevant, we check that the Annex XV Chapter II Section 4.1 statement is issued.

The PRRC's name, address and contact details are part of the actor registration data in Annex VI Part A, Section 1.4. If your EUDAMED actor registration needs to be created or updated, we handle it under our EUDAMED registration service.

Permanent and continuous in practice

Article 15(2) asks for a person at your disposal permanently and continuously. We therefore set the service up as a standing role for the duration of the contract, not as a project with an end date. The PRRC is named in your quality manual, holds sign-off authority in your release and vigilance procedures, and is informed of every new device, every revision of the technical documentation and every complaint that could be an incident.

In practice, a new model, a new label, a new package or a new market does not bypass the PRRC. A change record is opened, the PRRC assesses the effect on the technical documentation and the declaration of conformity, and the device is released only once the updates are complete. If the person in the role changes, the new PRRC's details are entered in your quality documents and your actor registration, and the task description is signed again.

Where the manufacturer's responsibility ends and ours begins

The PRRC ensures that the tasks in Article 15(3) are carried out. The PRRC does not replace the manufacturer. You draw up and sign the EU declaration of conformity, you take design and production decisions, and you run the quality management system. We check that this is done in line with the Regulation, report gaps in writing and withhold release sign-off until they are closed. Where more than one person shares the role, Article 15(4) requires the areas of responsibility to be stipulated in writing, and our task description does exactly that.

Qualification

The person we assign meets one of the Article 15(1) routes: a relevant university degree with professional experience in regulatory affairs or quality management systems for medical devices, or the longer professional experience route. Evidence of qualification is attached to the contract and kept in your file for the competent authority. Article 15(5) protects the PRRC from any disadvantage for doing the job properly, whether or not they are your employee, and the contract repeats it.

Process

  1. You send evidence of your micro or small enterprise status, your device list and your quality management system documents.

  2. We confirm that Article 15(2) applies, check the class of each device and review the state of the technical documentation.

  3. We write the task description against each point of Article 15(3); both sides sign it.

  4. The PRRC's details are entered in your quality manual, your procedures and your actor registration.

  5. The role runs continuously: release checks, documentation updates, surveillance and reporting follow the schedule in the contract.

What you receive

  • A task description and division of responsibilities written against Article 15(3).

  • The PRRC's qualification file: degree and evidence of professional experience.

  • The PRRC details and procedure revision notes for your quality management system.

  • A draft procedure for serious incident and field safety corrective action reporting.

  • Periodic check records covering release, documentation status and surveillance.

What we need from you

  • Evidence of micro or small enterprise status under Recommendation 2003/361/EC.

  • Device list with risk class and Basic UDI-DI.

  • Quality manual and your release, complaint handling and corrective action procedures.

  • Technical documentation and EU declarations of conformity.

  • PMS plan and, where available, the latest PMS report or PSUR.

Not provided

  • Notified body conformity assessment and CE certification.

  • Testing and laboratory work, including choosing a laboratory or arranging tests.

  • Interpreting or changing your technical specifications.

  • Finding importers or distributors.

Related services

Frequently asked questions

Can a micro or small manufacturer outsource the PRRC?

Yes. Article 15(2) does not require the PRRC to be within the organisation, as long as the person is permanently and continuously at the manufacturer's disposal. MDCG 2019-7 Rev.1 confirms that the role may be subcontracted to a third party when the qualification criteria are met.

Can you be the PRRC of a manufacturer based in the EU?

No. Medex is located in Türkiye. MDCG 2019-7 Rev.1 expects the PRRC of a manufacturer located in the Union to be located in the Union.

Do you take on the PRRC role for medium-sized or large manufacturers?

No. Under Article 15(1) they must have the PRRC within their own organisation. We can help write that person's task description and procedures.

Does the PRRC take over the manufacturer's legal responsibility?

No. The PRRC is responsible for ensuring the tasks in Article 15(3); the manufacturer's general obligations under Article 10 stay with the manufacturer.

Does this cover IVD manufacturers?

Yes. IVDR Article 15 follows the same structure, and the task description is written against the IVDR articles.

Is this the same service as the EU authorised representative?

No. The authorised representative is a separate role under Article 11. Many non-EU manufacturers need both; they are contracted separately.

What if our technical documentation is incomplete?

We list the gaps first. We can compile the technical documentation from your documents under our technical documentation gap review.

FAQs

bottom of page